Once a pre-demolition survey has been completed and any necessary precautions have been taken, the soft strip demolition can begin.
This process involves the systematic dismantling of internal structure materials, segregation and removal ensuring that the building is stripped down to its bare bones.
We aim to recycle up to 96% of materials removed from soft strip projects, our highly skilled workforce separates material into categories to be reused within the industry, glass, metal, wood, plasterboard, copper, wire, floor & wall coverings, plastics, bricks/blocks and insulation
If asbestos has been identified during the pre-demolition survey, it will be safely removed following strict regulations and guidelines to ensure the safety of workers and the surrounding environment. Specialised equipment and procedures are used to contain and remove asbestos, preventing any potential health risks.