Internal Sort Strip Demolition

Soft strip - ST Demolition Soft Strip on-site

Once a pre-demolition survey has been completed and any necessary precautions have been taken, the soft strip demolition can begin.
This process involves the systematic dismantling of internal structure materials, segregation and removal ensuring that the building is stripped down to its bare bones.
We aim to recycle up to 96% of materials removed from soft strip projects, our highly skilled workforce separates material into categories to be reused within the industry, glass, metal, wood, plasterboard, copper, wire, floor & wall coverings, plastics, bricks/blocks and insulation
If asbestos has been identified during the pre-demolition survey, it will be safely removed following strict regulations and guidelines to ensure the safety of workers and the surrounding environment. Specialised equipment and procedures are used to contain and remove asbestos, preventing any potential health risks.

Our Details

info@stdemolition.co.uk
0800 9956889

Birkenhead CH41 1HE.

About Us

ST Demolition and Groundwork Ltd are a robust and reliable demolition contractor able to achieve all manors of demolition, ranging from fire damaged buildings, technical demolitions, separation of buildings, high rise strip outs and remediation.